Ruins audiologs

Upper Control Room

All major power plant systems are connected to this main control room. Once repaired, the plant can be restarted here. The controls must be configured correctly or the plant will abort startup.

Spectral analysis detects alien language outside the human visual range. Recommend adaptation to improve your visual range before attempting to startup.